Riverline Market HallChicago, 2024

Area
5 600 m²
Year
2024
Structure
Steel
Status
Complete

Fig. 02 / Drawing set / Plan, section, elevation, axonometric

Fine lines drawn from the model / point cloud on the last tab

Drawn fromthe same model.

Every drawing below comes from the model the building was built and scanned against, with its grid, levels and the dimensions the site team worked to.

12345678ABC42 00028 000D1D2D3D4StageRaked seating / 620LobbyN010 mSCALE 1:400

Fig. 03 / Scan vs design / As built against as drawn

Grey under 3 mm / blue over 8 mm

The building,against its drawing.

Drag the handle to compare the design with the latest scan. Each point is coloured by how far the built surface sits from the drawn one.

42 00013 000+0.00+1.10+6.16+13.00+16.00StageRaked seatingSteel truss / 14 panels at 3 000Node T7010 mSCALE 1:300DESIGNAS BUILT

7 mm / Truss T4 bearing, inside tolerance, logged

Fig. 04 / Construction / Survey to handover

All milestones complete

Construction timeline

  1. Survey / Done
  2. Foundations / Done
  3. Structure / Done
  4. Envelope / Done
  5. Handover / Done

Sep 2021 to Jun 2024 / 33 months

Fig. 05 / Credits / Team

Everyone who built it

Credits

Client
Chicago Riverwalk Markets
Structure
Okafor Bridge and Frame
Services
Lakeside Building Services
Contractor
Harmon Kline Construction
Scan imagery
Norrvik

Fig. 06 / Narrative / What the model found

About 200 words

About the project

Client
Chicago Riverwalk Markets
Location
Chicago / United States
Sensors
174

Riverline Market Hall is a 90-metre steel shed on the west bank of the Chicago River, a covered market by day and an event hall at night. One roof of weathering steel trusses spans the floor without columns, with tall north glazing toward the water and a timber deck that steps down to the riverwalk.

The trusses were fabricated in Indiana and scanned twice, once in the yard and once after they were lifted. The second scan found the fourth truss sitting 7 millimetres off its bearing line, well inside tolerance, so it was logged and left. The harder lesson came in the first winter: 174 sensors showed the north doors losing more heat than the whole glazed wall, so a vestibule was added before the second season and heating fell by a fifth.

Fig. 07 / Energy / 24 months monitored

kWh per m² per month / dashed line is the target

Energy use,month by month.

Last 12 months
84 kWh/m²
Monthly target
6.8 kWh/m²
Months at or under target
12 / 24
Embodied carbon
236 kgCO2e/m²
Monitored energy use for Riverline Market Hall, kWh per square metre per month
PeriodMeasured
Oct 246.4 kWh/m²
Nov 247.6 kWh/m²
Dec 248.9 kWh/m²
Jan 259.6 kWh/m²
Feb 259.2 kWh/m²
Mar 258.1 kWh/m²
Apr 256.9 kWh/m²
May 255.8 kWh/m²
Jun 256.3 kWh/m²
Jul 256.9 kWh/m²
Aug 256.6 kWh/m²
Sep 255.9 kWh/m²
Oct 256.1 kWh/m²
Nov 257.2 kWh/m²
Dec 258.4 kWh/m²
Jan 269.1 kWh/m²
Feb 268.7 kWh/m²
Mar 267.6 kWh/m²
Apr 266.5 kWh/m²
May 265.5 kWh/m²
Jun 266 kWh/m²
Jul 266.6 kWh/m²
Aug 266.3 kWh/m²
Sep 265.6 kWh/m²
Monthly energy use per square metre of floor area, Oct 24 to Sep 26. The dashed blue line is the design target.

Fig. 08 / Materials / Structural mass

Share by weight, as built

Share of structural mass by material, Riverline Market Hall
MaterialShare
Steel46%
Concrete24%
Glass16%
Timber10%
Other4%

Fig. 09 / Lessons learned / Carried into the next model

03 entries

  1. L01Lesson learnedScan long-span trusses in the yard, where a correction still costs nothing.
  2. L02Lesson learnedOne open door lost more heat than 600 square metres of glass.
  3. L03Lesson learnedA second winter of data was worth more than any energy model at design stage.