Fig. 01 / Project 10 of 10 / Point cloud
Local grid / 1 : 400
Harbor Point LibraryBoston, 2026
- Area
- 4 300 m²
- Year
- 2026
- Structure
- Timber
- Status
- Complete
Fig. 02 / Drawing set / Plan, section, elevation, axonometric
Fine lines drawn from the model / point cloud on the last tab
Drawn fromthe same model.
Every drawing below comes from the model the building was built and scanned against, with its grid, levels and the dimensions the site team worked to.
Fig. 03 / Scan vs design / As built against as drawn
Grey under 3 mm / blue over 8 mm
The building,against its drawing.
Drag the handle to compare the design with the latest scan. Each point is coloured by how far the built surface sits from the drawn one.
9 mm / Harbor edge anchor plates, shimmed on site
Fig. 04 / Construction / Survey to handover
All milestones complete
Construction timeline
- Survey / Done
- Foundations / Done
- Structure / Done
- Envelope / Done
- Handover / Done
- Survey
- Foundations
- Structure
- Envelope
- Handover
Apr 2023 to Mar 2026 / 35 months
Fig. 05 / Credits / Team
Everyone who built it
Credits
- Client
- Boston Public Library Trust
- Structure
- Hollis Pike Structural
- Services
- Bayline Building Services
- Contractor
- Corrigan and Shaw Builders
- Scan imagery
- Norrvik
Fig. 06 / Narrative / What the model found
About 200 words
About the project
- Client
- Boston Public Library Trust
- Location
- Boston / United States
- Sensors
- 204
Harbor Point Library is a two-storey timber branch library on the edge of Boston Harbor, lifted a full storey above the flood line on a concrete plinth. The reading room faces the water through deep timber fins that shade the south glazing in summer and let low winter sun in.
The plinth was scanned before the timber went up, and the scan showed the anchor plates along the harbor edge set 9 millimetres high. The glulam frame was shimmed to suit on site in a day rather than refabricated. Since opening, 204 sensors have tracked flood water in the undercroft, timber moisture and daylight in the reading room, reporting to the model every fifteen minutes.
Fig. 07 / Energy / 24 months monitored
kWh per m² per month / dashed line is the target
Energy use,month by month.
- Last 12 months
- 52 kWh/m² design
- Monthly target
- 4.8 kWh/m²
- Months at or under target
- 06 / 06
- Embodied carbon
- 176 kgCO2e/m²
| Period | Measured |
|---|---|
| Oct 24 | No data |
| Nov 24 | No data |
| Dec 24 | No data |
| Jan 25 | No data |
| Feb 25 | No data |
| Mar 25 | No data |
| Apr 25 | No data |
| May 25 | No data |
| Jun 25 | No data |
| Jul 25 | No data |
| Aug 25 | No data |
| Sep 25 | No data |
| Oct 25 | No data |
| Nov 25 | No data |
| Dec 25 | No data |
| Jan 26 | No data |
| Feb 26 | No data |
| Mar 26 | No data |
| Apr 26 | 4.4 kWh/m² |
| May 26 | 3.9 kWh/m² |
| Jun 26 | 4.2 kWh/m² |
| Jul 26 | 4.7 kWh/m² |
| Aug 26 | 4.6 kWh/m² |
| Sep 26 | 4.1 kWh/m² |
Fig. 08 / Materials / Structural mass
Share by weight, as built
| Material | Share |
|---|---|
| Timber | 56% |
| Concrete | 28% |
| Glass | 9% |
| Steel | 4% |
| Other | 3% |
Fig. 09 / Lessons learned / Carried into the next model
03 entries
- L01Lesson learnedScan the plinth before the frame arrives, while a shim still solves the problem.
- L02Lesson learnedLifting the building a storey cost less than one flood insurance claim.
- L03Lesson learnedTimber fins did the work of a cooling plant in the first summer.